VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018

VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018

Sale price  $32.99 Regular price  $59.99
Skip to product information
VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018

VEVOR Telescoping Aluminum Work Plank, 8-13 ft, 500 lbs, 12.5 in Width - WBS-018

Save 45%was $59.99Everyday low price
1
Order todaySep 23
2
Ships in 1-2 business daysTracking emailed
3
Arrives Sep 28 – Oct 53-7 business days in transit · United States
  • 76 people are viewing this right now
  • Hurry, low stock — only 5 left at this price
  • Guaranteed safe checkout · 30-day returns
    Visa Mastercard American Express DiscoverPayPalApple Pay Google Pay
Sale price  $32.99 Regular price  $59.99

Secure checkout · Ships in 1-2 business days

VEVOR telescoping aluminum work plank with an adjustable 8-13 ft length range and 500 lbs maximum capacity. The plank has a 12.5 in width, built-in locks, a non-slip wide-tread platform, and straps at both ends for fastening to a scaffold footboard.

It is designed for indoor and outdoor scaffold work, including painting, hanging drywall, repair work, installing lights, and cleaning windows and doors.

  • Model: WBS-018
  • Material: Aluminum Alloy
  • Adjustable Length: 8-13 ft
  • Max. Capacity: 500 lbs
  • Item Width: 12.5 in
  • Net Weight: 34.39 lb
  • Product Dimensions (Closed State): 90.55x12.8x3.34 in
  • Includes: Telescoping Plank, Stainless Steel Wing Screws, Stainless Steel Hexagonal Screw, Stainless Steel Nuts, User Manual
Free U.S. shipping $75+$5.95 flat on orders under $75
Ships in 1-2 business days3-7 business days in transit
30-day returnsFull details below

Shipping, returns and help

Shipping & delivery
Orders $75 and overFree standard shipping
Orders under $75$5.95 flat rate
Handling1-2 business days
Transit3-7 business days
Ships toUnited States

You get a tracking number by email as soon as your order ships. Full shipping policy

Returns & refunds

Return within 30 days of delivery in original condition and packaging. Refunds go back to the original payment method within 5-10 business days after we receive the item.

Email support@dealaislemart.com with your order number to start a return. Full returns policy

Questions? Talk to a real person

Email support@dealaislemart.com · Online orders 24/7 · Support Mon-Fri, 9 AM - 5 PM CT. We answer every message, usually within one business day.

You may also like